Fleet Status
Total Armada
28
3 Excavator · 22 Dump Truck · 3 Fuel Truck
Armada Aktif
18
64.3% dari total armada
Idle / Standby
6
Menunggu penugasan
Maintenance
4
2 kritis · 2 terjadwal
Produksi Hari Ini
48,250t
Target: 57,575t (83.8%)
Produksi 7 Hari Terakhir
Ton · Shift DS+NSStatus Peralatan
Saat iniProduksi Per Jam — Shift DS (06:00 – 18:00)
Ton/jamArmada Aktif
Lihat semua →| ID Armada | Tipe | Model | Status | Lokasi | SMU (Jam) | Fuel (%) | Siklus |
|---|---|---|---|---|---|---|---|
| EX201 | Excavator | PC1250 | ● Aktif | Pit A | 34,069 | 80% | 9/45 |
| EX202 | Excavator | PC2000 | ● Aktif | Pit B | 28,441 | 65% | 7/45 |
| EX203 | Excavator | PC1250 | ⚠ Maint. | Workshop | 41,200 | 20% | — |
| DT101 | Dump Truck | HD785 | ● Aktif | Haul Rd | 34,095 | 64% | 32/90 |
| DT102 | Dump Truck | HD785 | ● Aktif | ROM | 34,080 | 30% | 28/90 |
| DT103 | Dump Truck | HD1500 | ● Aktif | Pit A | 34,095 | 70% | 35/90 |
| DT104 | Dump Truck | HD785 | ⛽ Refuel | Fuel Bay | 34,095 | 45% | 30/90 |
| DT105 | Dump Truck | HD785 | ● Idle | Standby | 21,330 | 88% | — |
| DT106 | Dump Truck | HD1500 | ⚠ Breakdown | Pit B | 38,120 | 52% | — |
| FT001 | Fuel Truck | FM-450 | ● Operasi | Pit A | 12,045 | 92% | — |
Peringatan Aktif
5 AktifDT117 — Breakdown
Engine fault P0401 · Pit B · 14:23
DT116 — Delay Fueling
Fuel < 15% · Menunggu FT002 · 14:01
EX203 — PM Service
SMU mendekati 41,250 · Due besok
DT102 — Fuel Rendah
Fuel 30% · Requesing FT001 · 14:15
Shift DS — 5 Operator Standby
DT1005, DT120, DT121, DT122, DT123
Dashboards/Real-time Positioning
Real-time Positioning
Posisi Armada ● Live
Dispatch Live
EX201
PC1250
● Aktif
Pit A
80%
9/45
5,548.2t
Assign TrucksLokasi DumpJalur Haul
DT101 · HD785
ROM – WS01
Jalur Haul ke ROM
DT103 · HD1500
ROM – WS01
Jalur Haul ke Pit Tengah
+ Assign truck
+ Assign lokasi
+ Assign jalur
+ Assign truck
+ Assign lokasi
+ Assign jalur
EX202
PC2000
● Aktif
Pit B
65%
7/45
4,830.0t
Assign TrucksLokasi DumpJalur Haul
DT104 · HD785
Waste Dump – WD1
Jalur Haul ke Pit Tengah
+ Assign truck
+ Assign lokasi
+ Assign jalur
+ Assign truck
+ Assign lokasi
+ Assign jalur
Papan Pesan
RiwayatDT117 Breakdown
Engine fault · Pit B
DT116 Delay Fueling
Fuel rendah · FT002 otw
Siap Dispatch
Lihat semua
DT108
DT109
DT110
DT111
Standby — No Operator
Lihat lebih sedikit
DT1005DT101DT103
DT104DT105DT106
DT120DT121DT122
DT123DT124DT125
DT126
Lokasi Waste Dump
Lihat semuaCENTRAL WASTE DUMP – WS01
NORTH WASTE DUMP – WS02
Mine Control/Production Targets
Production Targets
Total Truck Planned Tonnes
57,575.00t
Total Truck Planned Loads
490
Total Excavator Tonnes
6,920.00t
Total Excavator Loads
519
Excavator
| Nama Peralatan | Planned Truck Loads | Planned Tonnes | Avg Truck Loading Time | Availability (Menit) | Availability (%) | Standby (Menit) | Standby (%) | Utilisasi (Menit) | Utilisasi (%) |
|---|---|---|---|---|---|---|---|---|---|
| ▶ PC1250 | |||||||||
| ▶ PC2000 |
Dump Trucks
| Nama Peralatan | Planned Loads | Avg. Load | Avg. Trip Time | Planned Tonnes | Availability (Menit) | Availability (%) | Standby (Menit) | Standby (%) | Utilisasi (Menit) | Utilisasi (%) |
|---|---|---|---|---|---|---|---|---|---|---|
| ▶ HD1500-7 | ||||||||||
| ▶ HD785 | ||||||||||
| ▶ HD1500-8 |
Mine Control/Fuel Dispatcher
Fuel Scheduler
DT101
GPS LokasiLihat di Map
SMU34,069.5
Fuel Rate79.7 L/h
Fuel Level
64%
DT102
Minta Fuel
GPS LokasiLihat di Map
SMU34,080.1
Fuel Rate81.3 L/h
Fuel Level
30%
DT103
GPS LokasiLihat di Map
SMU34,095.6
Fuel Rate75.5 L/h
Fuel Level
70%
DT104
Minta Fuel
GPS LokasiLihat di Map
SMU34,095.3
Fuel Rate78.2 L/h
Fuel Level
45%
DT105
Kritis
GPS LokasiLihat di Map
SMU34,069.5
Fuel Rate79.7 L/h
Fuel Level
25%
DT106
GPS LokasiLihat di Map
SMU38,120.0
Fuel Rate72.1 L/h
Fuel Level
52%
Papan Pesan
RiwayatDT117 Breakdown
Engine fault · Pit B
DT116 Delay Fueling
Menunggu fuel truck
Fuel Truck
FT001 — FM-450Aktif
FT002 — FM-450Aktif
Prioritas Diminta
Lihat lebih
⏱ Dalam 3 jam
⏱ Dalam 2 jam
🔔 Prioritas 3
⚠ Urgent Waste
🚨 URGENT di PIT
Mine Control/GPS Fleet Tracking
GPS Fleet Tracking
Trucking Plan vs Actual
Trucking Plan vs Actual
Halaman ini sedang dalam pengembangan.
Digging Plan vs Actual
Digging Plan vs Actual
Halaman ini sedang dalam pengembangan.
Gantt Work Scheduler
Gantt Work Scheduler
Halaman ini sedang dalam pengembangan.
ROM/Mill Targets
ROM/Mill Targets
Halaman ini sedang dalam pengembangan.
Blend Plans
Blend Plans
Halaman ini sedang dalam pengembangan.
Waste Dump Management
Waste Dump Management
Halaman ini sedang dalam pengembangan.
ROM Management
ROM Management
Halaman ini sedang dalam pengembangan.
Message Centre
Message Centre
Halaman ini sedang dalam pengembangan.
Ore Spotter
Ore Spotter
Halaman ini sedang dalam pengembangan.
Pre Shift Information
Pre Shift Information (PSI)
Halaman ini sedang dalam pengembangan.
Roster Scheduler
Roster Scheduler
Halaman ini sedang dalam pengembangan.
Shift Planner
Shift Planner
Halaman ini sedang dalam pengembangan.
Production
Production
Halaman ini sedang dalam pengembangan.
Fleet Timeline
Fleet Timeline
Halaman ini sedang dalam pengembangan.
Geofences
Geofences
Halaman ini sedang dalam pengembangan.
Operations Fuel Dispatcher
Operations Fuel Dispatcher
Halaman ini sedang dalam pengembangan.
Fuel Status
Fuel Status
Halaman ini sedang dalam pengembangan.
Digger Ore Tracking
Digger Ore Tracking
Halaman ini sedang dalam pengembangan.
Ore Grade Control
Ore Grade Control
Halaman ini sedang dalam pengembangan.
Survey & Reconciliation
Survey & Reconciliation
Halaman ini sedang dalam pengembangan.